Archive for July, 2013

Confidential Client – Cafeteria

This confidential client, a Fortune 500 Pharmaceutical company, asked Cyma Builders to manage the construction of a new state of the art cafeteria including full food prep, upscale service areas, café style seating for 200 people and adjacent lunch/work conference rooms at their Bridgewater, NJ headquarters.

The project began with demolition and environmental remediation of what was a former facility sterilization area. Cyma installed new electrical and mechanical infrastructure including underslab plumbing for waste and drain piping, new exhaust systems to support the new grill lines and ovens and Ansul systems to accompany the new hood/exhaust packages.

New men’s and women’s bathrooms were included in the project, as was an exterior patio which required new exterior and secondary entrances into the main building. Interior finishes were all high level with stainless steel countertops, Zolatone finish at soffits, quarry tile floors, architectural grade lighting package and numerous architectural details such as skylights and center island displays.

Comcast – 1500 Market Street

Cyma has been a “go to” contractor for Philadelphia based Comcast Corporation at numerous locations including their 1500 Market Street location. We’ve renovated entire floors including office, lobby and core spaces and we’ve also performed various pre-construction services including conceptual estimating, project planning and operation and maintenance. Comcast’s continuous restack of office spaces often requires careful coordination with adjacent occupied spaces and fast-track construction execution.

Cyma has been recognized by Comcast for not only completing projects on time, but also because of the strict cost controls and high quality standards we have in place.

Newsletter Sign Up

  • This field is for validation purposes and should be left unchanged.

Additional Resources