Archive for June, 2014

Thomas Jefferson University Hospital – Helipad Replacement

Thomas Jefferson University, located in the heart of downtown Philadelphia, is one of the nation’s top rated, and busiest, trauma centers. The project team assembled by Cyma was able to complete the project within the scheduled time frame, allowing heliport services to resume at Thomas Jefferson University with no additional impact to service.

The existing landing pad constructed of wood trusses and plywood-landing surface was no longer in conformance with FAA and PENNDOT regulations. Cyma first removed the existing structure, as well as deteriorating concrete planking that overhung the sidewalk in front of the hospital. Additional demolition consisted of the removal of a set of existing stairs, patient ramp and removal of all obstructions protruding above the new landing pad elevation.

Cyma constructed a new steel support structure, extruded aluminum landing surface, patient ramp, and safety netting system to bring the Heliport into conformance with the latest regulations. Additional features include an automatic snow melting system and foam fire suppression system.

Centocor – Building 1 Masterplan

Cyma Builders renovated an existing R&D Facility for the Bioprocess Sciences and Purification Sciences division, which supports Centocor’s manufacturing operations including trouble-shooting, technology transfer, and development of improvements to current manufacturing methods. Much of the work took place directly adjacent to occupied space which required heavy coordination with tenants and building management in order to properly coordinate utility shut-down schedules and logistics. New installation included distribution of steam, condensate, and chilled water for HVAC, process utility, and process use. Installation of lab gas manifolds from bulk storage and distribution for process use, installation of new below slab process waste collection system and new 480V electrical service, secondary gear, and distribution was also incorporated into this project. We also replaced the 208V electrical service, secondary gear, and distribution and built new IT distribution closets. New construction of cold storage units, a new Analytical Lab, administrative offices and new toilet rooms completed this phase of the project.

The second phase of the Building 1 Masterplan Project involved the coordination and installation of new MEP infrastructure to support laboratory systems. We were again working directly adjacent to occupied areas and successfully coordinated shutdowns and access with building management and tenants. The second phase also required constructed of a centralized wash & autoclave facility, distribution of utilities for a new chilled water air handling unit and installation of a new air-cooled chiller that feeds the new chilled water air handling unit.