This Fortune 500 Pharmaceutical company’s Spring House campus condenser water loop is supported by six (6) cooling towers, four (4) of which were original construction to the CUP Plant. Due to dropping efficiency and overall age of wearable components, cooling tower overhaul was necessary. The refurbishment option was chosen in lieu of full replacement due logistical difficulties. Replacement of all existing cooling tower wearable parts including PVC fill, sheaves, bushings, shafts, bearings, belts, nozzles, and motors to provide 95% efficiency. Cells 1 & 2 and 3 & 4 were isolated...
Confidential Client – M4 Cooling Tower Upgrades
This Fortune 500 Pharmaceutical company’s high volume, pharmaceutical production facility had ongoing issues with their 20 year old 800 ton cooling towers breaking down, which not only impacted the comfort of building occupants but also the supply of process chilled water to manufacturing equipment. Working in conjunction with both the cooling tower manufacture’s rep and Genesis Engineers, Cyma was contracted to provide an expedited refurbishment under an EPCM platform.
Due to the 24/7 operations of the facility, a shutdown of chilled water supply was intolerable. A set of 500 ton...
Confidential Client – B42 Waste Neutralization
In 2008, this Fortune 500 Pharmaceutical company completed construction on a new R&D facility (B42 – Research Center 1) at their Spring House campus. This building was designed with standalone utility and waste systems that operated independent of the existing site CUP. In 2012, the site started experiencing issues with high levels of copper in effluent being let from the site. It was determined that improperly designed HVAC system were the culprit; however, the issue prompted the site to consolidate their Process Waste Neutralization to the existing Plant located onsite, rather than...
Confidential Client – B42 Boiler Upgrades
This Fortune 500 Pharmaceutical company’s B42 in Spring House, PA was supported by three (3) boilers equipped with burners that had become obsolete. Additionally, one of the burners failed due to consistently operating at extremely low turn-down, below what the equipment was designed to support. These boilers supported several central utilities critical to building operation, including humidification, hot water reheat, lab hot water and domestic hot water. Cyma Builders furnished and installed new Johnson Burners on the boilers during controlled shutdown to limit operation risk to the...
DPT Laboratories – Washroom Prep Suite
The DPT Laboratories Washroom Prep Suite was a multi-faceted project with the overall goal of constructing a new wash room to support current and future filling operations as well as the construction of new utilities to support the future expansion needs of the facility. For more details and project photographs, check out the project page at the link below:
DPT Laboratories – Washroom Prep Suite
Confidential Client – Horsham Workplace Improvements
This project is a continuation of company-wide office upgrades currently ongoing within this Fortune 500 Pharmaceutical company to provide a more flexible workplace. Project scope included architectural modifications to open up the floor plan, installation of glass-wall demountable partitions at office fronts and MEP upgrade to accommodate new furniture systems and changing floor plan. The work was performed strategically across two separate active buildings allowing for minimal impact to ongoing business operations. Cyma Builders handled management of all personnel moves and furniture...
Cyma Superintendent Jeff Walters Recognized as ‘Best of the Best’ at SADV’s 2015 Professional Showcase
Cyma Builder’s Jeff Walters has been recognized by the Subcontractors Association of Delaware Valley (SADV) as one of the ‘Best of the Best’ in the Superintendent category during their 2015 Professional Showcase. Jeff’s hard work and dedication to his profession are a constant asset to Cyma’s organization and the clients we support. Congratulations to Jeff on this well deserved honor!Jeff Walters2
SADV is a membership association representing multiple trades, suppliers, vendors, building owners, engineers and architects in the Delaware Valley construction industry.
Johnson & Johnson – Office AHU Infrastructure Replacement
Cyma Builders & Construction Managers was contracted to manage the strategic replacement of packaged air handling equipment for a group of office buildings in Horsham, PA. Each air handling unit had reached its projected life expectancy, and was beginning to experience continuous maintenance issues. Seven (7) units were replaced in total ranging from 20,000 – 30,000 CFM (Approx. 175 Tons/EA).
All buildings were fully occupied during normal business hours, meaning that any shutdown of the HVAC system or crane picks could not occur during that time. In order to mitigate this issue, the...
Quest Diagnostics – Office Relocation
Cyma Builders & Construction Managers was selected as Quest Diagnostic’s strategic construction partner to assist with the relocation of their corporate billing operations from an existing leased facility to a new location to support the organizations growth. The project involved renovation of a three (3) story office building to accommodate Quest’s programmatic needs. The project was constructed on a fast track basis, with overall completion requirements within twelve (12) weeks of start of construction, and partial occupancy beginning within eight (8) weeks of start of construction....
Lexicon – Laboratory Fit Out
Cyma was awarded a construction management contract to perform complete interior demolition and new fit-out of approximately 8,500 SF of new laboratory in Lexicon Pharmaceutical’s new facility.
New work began with construction of a self-contained penthouse mechanical unit built to supplement (27) fume hoods. New piped gas utilities, a new DI water system, and new architectural finish package including lab grade millwork, working surfaces and fixtures were also required of this project.
The construction was completed successfully on a fast-track schedule and within the project...
Monell Chemical Senses – Laboratory & Office Fit Out
Cyma completed a project for Monell Chemical Senses in downtown Philadelphia at 35th and Market Streets. The project required conversion of an existing 12,500 SF office plan to a new chemistry lab on the third floor of a four story building, with occupancy on the first, second, and fourth floors. Working in downtown Philadelphia, combined with working inside an occupied building made this a challenging project to say the least, however Cyma has vast experience dealing with both difficult scenarios.
Existing toilet room cores adjacent to the work area were upgraded and new MEP work included...
Centocor – Building 1 Masterplan
Cyma Builders renovated an existing R&D Facility for the Bioprocess Sciences and Purification Sciences division, which supports Centocor’s manufacturing operations including trouble-shooting, technology transfer, and development of improvements to current manufacturing methods. Much of the work took place directly adjacent to occupied space which required heavy coordination with tenants and building management in order to properly coordinate utility shut-down schedules and logistics. New installation included distribution of steam, condensate, and chilled water for HVAC, process...